Skip to content
LoweLabs

Accelerator · AI Strategy

AI ideas aren't scarce. Captured value is.

Turn strategic priorities into opportunities worth pursuing. Use the AI Value Canvas to agree what changes, how value is captured and what evidence justifies the next investment.

Free. No sign-up required.

The canvas in practice

See the conversation on the page.

Two familiar business problems. One shared method for deciding what is valuable, practical and worth doing next.

Two examples. Select a tab to switch between them.

Strategic priority
Protect throughput and operating margin.
Value destination
Contribution from recovered saleable production.
Starting idea
“Use AI to predict equipment failures.”
After the workshop
“Test whether earlier warnings help the planner prevent stoppages on one packaging line.”

Workshop decision

Investigate before committing.

Next:
Check the breakdown history, sensor coverage and repair workflow for one line.
Owner:
Maintenance Manager.
Review:
Day 10 of the initial investigation. Confirm whether a controlled trial is viable.
What this example makes visible

The team needs useful warning time, a repair window and someone able to act. A more accurate prediction creates little value if maintenance cannot intervene.

Illustrative economics: 50 hours of avoided downtime a year × A$5,000 contribution per hour = A$250,000 gross benefit. Less A$50,000 annual costs = A$200,000 a year before setup. This counts only if the recovered production can be sold. Validate avoidable downtime, demand, contribution and all intervention costs.

Design inputs: Machine identity, event history, refresh and alert requirements, a planner-approved worklist, safety boundaries, outcome measurement and operating ownership. Compare with simple alarm rules before adding modelling complexity.

Read the canvas as text

How to score: Judge each section against its criteria and supporting evidence. 0 to 2: missing or unclear. 3 to 4: mostly assumptions. 5 to 6: partly supported. 7 to 8: strongly supported. 9 to 10: demonstrated. Record why. Use low scores to plan the next work. Do not average away a critical blocker.

  1. Decision or process to optimise

    Which machine needs attention before it stops the packaging line? Start with one bottleneck line. Owner: Maintenance Manager.

    Score: 7/10. Clear decision and owner; impact to validate.

    Criteria: Specific + valuable + actionable + in your sphere of influence

  2. Decision-making process this will replace

    Calendar servicing + reactive repairs. Operator warning signs are not joined up.

    Score: 5/10. Process described; operator validation pending.

    Criteria: Correctly identified + room for improvement + appropriate buy-in

  3. Prediction target

    Failure likely within 7 days? Enough warning to inspect and plan a repair.

    Score: 5/10. Useful target; labels and lead time untested.

    Criteria: Concrete + data exists + closely tied to business goal

  4. Types of features to be used

    Vibration + temperature. Breakdown and repair history. Run hours + production load. Operator observations. Can we match these by machine?

    Score: 4/10. Useful signals; availability unverified.

    Criteria: Available + likely indicative of prediction target

  5. Implementation plan

    Check data. Compare simple alarm rules. Trial a maintenance worklist. Planner approves every action.

    Score: 5/10. Practical outline; feasibility untested.

    Criteria: Concrete actions are well defined and achievable

  6. Data science line-up

    Maintenance Manager: value owner. Operator + planner: workflow. Engineer: data and model. Finance: benefit.

    Score: 4/10. Roles identified; people and time unconfirmed.

    Criteria: Available + familiar with business problem

  7. Value statement

    Assume 50 hours avoided a year × A$5,000 contribution per hour = A$250,000 gross. Less A$50,000 annual costs = A$200,000 a year before setup. Only if recovered production can be sold.

    Score: 4/10. Explicit economics; baseline and assumptions untested.

    Criteria: Specific + valuable + actionable + in your sphere of influence

  8. Biggest risks

    False alarms: wasted maintenance. Missed failure: retain safety controls. No repair window: no value. Next: validate data + repair workflow.

    Score: 5/10. Main risks identified; controls not yet tested.

    Criteria: Specific + valuable + actionable + in your sphere of influence

Predictive maintenance: completed canvas

Open original (opens in a new tab)
Completed machine learning canvas, "Prevent packaging-line downtime". Handwritten notes in eight boxes (decision, current process, prediction target, features, implementation plan, team, value and risks), each with a score out of 10 and a one-line reason. Scores run from 4 to 7. The full text is below the image.

Illustrative workshop examples, not client results. Scores and financial figures are assumptions to test. The examples use the same boxes and scoring criteria as the downloadable canvases. The one-line reasons and the scoring guide are added to show how to use the scores.

Why AI strategies stall

AI creates new options for improving service, reducing cost and changing how work gets done. The challenge is choosing where those options advance your strategy and can be put into practice.

Three patterns show up again and again:

  • Pilots stall. Success was never defined, so "it worked" can always be argued.
  • Value is never banked. The old way keeps running alongside the new one, and the P&L never moves.
  • Priorities follow the technology. Attractive ideas win attention while the business problem and value remain unclear.

Be clear about the reason to invest: economic return, strategic necessity, resilience or customer differentiation. Each needs its own evidence.

What the AI Value Canvas is

A one-page prioritisation tool for a single opportunity. It brings the business, frontline team and specialists together to test value, practicality and what it will take to make the change work.

  • What decision or workflow are we changing, and what does it replace today?
  • What does success look like, measured how, against what baseline?
  • Who owns the benefit, how is it captured and where does it show up?
  • What are the biggest risks, and how are they contained?

Score each box out of 10 against its criteria and the evidence behind it. Record why. Use low scores to plan the next work. Do not average away a critical blocker. Record the next decision, its owner and the evidence needed.

How to use it

  1. Step 1

    Connect to the strategy.

    Start with business priorities, customer needs, industry change and obligations. Consider new technology alongside current capabilities and constraints.

  2. Step 2

    Scan together, then compare.

    Use an initial 20 to 30 minute pass per opportunity. Include someone who does the work. Compare value, practicality, time to value, dependencies and confidence across the shortlist.

  3. Step 3

    Decide what happens next.

    Proceed, investigate, reshape or stop. Agree the critical uncertainty, an accountable owner and a review date. Unknowns become a defined investigation, not an implied build commitment.

  4. Step 4

    Carry the evidence forward.

    For selected opportunities, substantiate the baseline, economics and controls. Use the findings to brief design, agree delivery gates and track adoption and realised value in operation.

A team sport

Bring the people who make it work.

Specialists contribute depth. The whole team agrees the business change, acceptable trade-offs and next decision.

  • Business owner

    Owns the outcome and investment decision.

  • Someone doing the work

    Tests the problem, available actions and real workload.

  • Finance partner

    Tests how benefits become value and who captures it.

  • Data & AI specialist

    Tests information, evidence and simpler alternatives.

  • Architect / process owner

    Tests integration, delivery and operating dependencies.

  • Risk / privacy specialist

    Tests permissions, failure consequences and controls.

Leave with a decision or a defined investigation.

A priority. An accountable owner. The critical uncertainty. Evidence required. A next action and review date.

Two canvases, one method

Machine learning

Traditional AI

For prediction and optimisation: churn, demand, risk scoring, next best action, truck roll avoidance.

Covers: The decision to optimise, the process it replaces, prediction target, data and features, implementation plan, team, value statement and biggest risks.

Assistants, copilots and agents

Generative and agentic AI

For assistants, copilots, document processing and agents that take actions.

Covers: The task or workflow, the process it replaces, context, tools and action space, autonomy and human checkpoints, success definition, evaluation and assurance, value statement, and risks and guardrails.

Not sure which one? If the output is a prediction or a score, use Traditional AI. If it is generated content or an action taken on someone's behalf, use Generative and agentic.

The AI Value Playbook

From strategic intent to changed work.

The canvas supports prioritisation. Its outputs become the brief for designing, building and embedding the chosen solution.

Inputs

  • Business strategy
  • Customer & operational needs
  • Industry dynamics & obligations
  • New technology, including AI
  • Capabilities & constraints
  1. 01 / Prioritise

    Work the canvas

    Compare opportunity value, practicality, dependencies and evidence.

    Gate: proceed, investigate, reshape or stop.

  2. 02 / Design

    Shape the solution

    Resolve uncertainty. Design architecture, workflow, data and controls.

    Gate: viable design and delivery commitment.

  3. 03 / Build & embed

    Change the process

    Build, integrate and test. Equip people and assign operating responsibility.

    Gate: ready for controlled operation.

  4. 04 / Measure & adapt

    Capture the value

    Measure adoption, outcomes, costs and harm. Improve, scale or stop.

    Gate: evidence supports the next commitment.

Evidence from discovery, delivery and operation feeds back into priorities.

What the canvas hands over to design
  • Outcome & workflow

    Agreed users, actions, owners and baseline → process design, roles and adoption plan.

  • Information & dependencies

    Required data, access and gaps → architecture options, integration, quality and refresh design.

  • Authority & failure

    Approval boundaries and consequences → permissions, fallback, audit and monitoring.

  • Value & evidence

    Economic assumptions and critical uncertainty → trial design, acceptance criteria, cost envelope and benefit tracking.

One canvas per opportunity. Compare them as a portfolio. Sequencing also depends on shared foundations, delivery capacity and strategic necessity. The wider playbook includes organisational impact, decision design and differentiation.

Questions every AI portfolio should answer

  1. 1.Which priority or obligation does this advance, and what outcome will improve?
  2. 2.Who owns the benefit, and how will it be captured and measured?
  3. 3.What must change in everyday work, and what will we stop doing?

If your team can't answer all three for every AI initiative you are funding, we should talk.